Under Retrofit modernising or upgrading existing (mostly older and no longer efficient) equipment is understood. Our trained team with over 25 years of experience in the machinery, especially welding machines, development sector prepare our clients for future-orientated solutions and accompany them from the idea generation to the maintenance in the daily production operation with client' individual requirements.

Block 1

  • De- & Stacking of half shell panels
  • Back-up ring unit EBV
  • Tack-spot welder P1
  • Guillotine TS10
  • Step7 Upgrade
  • Weld controller PSC02
  • Mobile control panel MP02
  • Control cabinet Siemens Step7

Block 2a/b

  • Extension of multi-spot welding rows
  • Pneumatic welding guns for convector welding
  • Automated convector feeding
  • Step7 Upgrade
  • Weld controller PSC02
  • Mobile control panel MP02
  • Control cabinet Siemens Step7

Block 3

  • Upgrade to longline welding heads
  • Encoder positioning
  • Step7 Upgrade
  • Weld controller PSC02
  • Mobile control panel MP02
  • Control cabinet Siemens Step7

Block 4

  • Guillotine TS10
  • Encoder positioning
  • Step7 Upgrade
  • Weld controller PSC02
  • Mobile control panel MP02
  • Control cabinet Siemens Step7

Block 5

  • Encoder positioning
  • Step7 Upgrade
  • Weld controller PSC02
  • Mobile control panel MP02
  • Control cabinet Siemens Step7

Block 6

  • Mobile control panel MP02 for Schlatter AG und LEAS test tank